Go to main content

SPARC M8 and SPARC M7 Servers Installation Guide

Exit Print View

Updated: September 2017
 
 

Tools Required for Stand-Alone Server Installation

Before installing the server into a rack, assemble the following tools:

  • Two or more people to unpack, move, and install the server

  • Mechanical lift capable of lifting 1000 lbs (454 kg) up to 60 in. (1524 mm)

  • A tool to cut the banding straps on the shipping container

  • A box cutter to cut the tape on the shipping container

  • A pen or pencil to mark the rackmounting holes

  • 12-mm wrench, used to lower or raise the leveling feet (included in Sun Rack II shipping kit)

  • T30 Torx screwdriver

  • T20 Torx screwdriver

  • Rackmount Guide


Note -  When installing the stand-alone server into a non-Oracle rack, refer to the rack documentation for the installation instructions, including the number of people and the list of tools required.

Related Information