Connecting Rack Cables
Note -
The procedures in this topic are for SPARC M7-16 servers and factory-rackmounted
SPARC M8-8 and SPARC M7-8 servers. If you are installing a stand-alone server, go to
Connecting SP Cables to continue the
installation.
|
|
Unpack and connect the six PDU power cords to the facility AC
power grids.
|
|
Optionally connect serial and network cables to the PDU metering
units to monitor the voltage and current of the connected equipment
over the network.
|
|
For additional grounding, optionally attach a chassis earth ground
cable to the rack.
|
|
|