Go to main content

SPARC M8 and SPARC M7 Servers Installation Guide

Exit Print View

Updated: September 2017
 
 

Connecting Rack Cables


Note -  The procedures in this topic are for SPARC M7-16 servers and factory-rackmounted SPARC M8-8 and SPARC M7-8 servers. If you are installing a stand-alone server, go to Connecting SP Cables to continue the installation.
Description
Link
Unpack and connect the six PDU power cords to the facility AC power grids.
Optionally connect serial and network cables to the PDU metering units to monitor the voltage and current of the connected equipment over the network.
For additional grounding, optionally attach a chassis earth ground cable to the rack.

Related Information