Go to main content

SPARC T5-2 Server Service Manual

Exit Print View

Updated: February 2019
 
 

Run POST With Maximum Testing

This procedure describes how to configure the server to run the maximum level of POST.

  1. Log in to Oracle ILOM.

    See Log In to Oracle ILOM (Service).

  2. Set the virtual keyswitch to diag so that POST runs in service mode.
    -> set /HOST keyswitch_state=diag
    Set keyswitch_state to Diag
    
  3. Reset the server so that POST runs.

    There are several ways to initiate a reset. This example shows a reset using the reset command.

    -> reset /SYS
    Are you sure you want to reset /SYS (y/n)? y
    Resetting /SYS
    

Related Information