Oracle Fabric Interconnect Hardware User's Guide

Exit Print View

Updated: July 2016
 
 

Prepare for the Procedure

  1. Read important information before beginning this procedure. See Installation Considerations.

    A fully loaded chassis can be heavy. Always follow safety and safe-handling procedures when lifting and handling the equipment.

  2. Gather the necessary tools and prepare a grounded work surface for the Fabric Interconnect chassis.
  3. Properly affix an ESD wriststrap.
  4. Find a second person to assist with removing the chassis from the rack and installing it when the new FP2 is installed.