PreviousNext JavaScript must be enabled to correctly display this content
  • Title and Copyright Information
  • Preface
  • 1 Introduction to JD Edwards EnterpriseOne Shop Floor Management
    • JD Edwards EnterpriseOne Shop Floor Management Overview
    • JD Edwards EnterpriseOne Shop Floor Management Business Processes
      • Shop Floor Process
    • JD Edwards EnterpriseOne Shop Floor Management Integrations
      • JD Edwards EnterpriseOne Product Data Management
      • JD Edwards EnterpriseOne Distribution Requirements Planning, Master Production Scheduling, and Material Requirements Planning
      • JD Edwards EnterpriseOne Procurement
      • JD Edwards EnterpriseOne Quality Management
      • JD Edwards EnterpriseOne Engineer To Order
      • JD Edwards EnterpriseOne Warehouse Management
      • JD Edwards EnterpriseOne Sales Order Management
      • JD Edwards EnterpriseOne Payroll
      • JD Edwards EnterpriseOne Inventory Management
      • JD Edwards EnterpriseOne Kanban Management
      • JD Edwards EnterpriseOne Demand Flow Management
    • Shop Floor Management Implementation
      • Global Implementation Steps
      • Shop Floor Implementation Steps
  • 2 Understanding Shop Floor Management
    • Shop Floor Management Features
      • Hours and Quantities Tracking
      • Reporting
      • Material Tracking
      • Manufacturing Accounting
      • Production Scheduling and Tracking
      • Work Order and Rate Schedule Creation
      • Process or Routing Instructions
      • Parts List
    • Tables for Shop Floor Management
    • Types of Manufacturing
      • Discrete Manufacturing
      • Process Manufacturing
      • Repetitive Manufacturing
  • 3 Understanding Lot Processing
    • Lot Processing
    • Lot Creation
    • Lot Status
    • Grade and Potency
      • Grade and Potency Qualifications
      • Grade and Potency Control
      • Lot and Serial Control Items
  • 4 Setting Up Shop Floor Management
    • Understanding Shop Floor Management Setup
      • Overview of Shop Floor Management Setup
      • Prerequisites
      • User-Defined Codes for Work Orders
      • Work Center Setup
      • Resource Unit Setup
    • Setting Up Shop Floor Calendars
      • Understanding Shop Floor Calendar Setup
      • Forms Used to Set Up Shop Floor Calendars
      • Setting Processing Options for the Shop Floor Calendar Program (P00071)
        • Interop
      • Setting Up Shop Floor Calendars
      • Revising Shop Floor Calendars
    • Setting Up Manufacturing Constants
      • Understanding Manufacturing Constants Setup
        • Work Order Activity Rules Processing for Branch Plant (Release 9.2 Update)
      • Form Used to Set Up Manufacturing Constants
      • Setting Up Manufacturing Constants
        • Manufacturing Constants
        • Shifts
        • Commitment Control
    • Setting Up Employee Labor Rates
      • Understanding Employee Labor Rate Setup
      • Form Used to Set Up Employee Labor Rates
      • Setting Up Employee Labor Rates
    • Setting Up Item-to-Line Relationships
      • Understanding Item-to-Line Relationship Setup
      • Form Used to Set Up Item-to-Line Relationships
      • Setting Up Item-to-Line Relationships
  • 5 Working with Work Orders and Rate Schedules
    • Understanding Work Orders and Rate Schedules
    • Understanding Work Order or Rate Schedule Creation
    • Understanding Attachment of Supplementary Information
    • Understanding Start Date Calculation
      • Fixed Lead Time
      • Variable Lead Time
    • Understanding Work Order Backscheduling
    • Understanding Shop Paperwork Generation
    • Entering Work Order Headers
      • Understanding Work Order Header Entry
      • Prerequisites
      • Form Used to Enter Work Order Headers
      • Setting Processing Options for the Enter/Change Order Program (P48013)
        • Defaults
        • Opt Defaults (optional defaults)
        • Sales / Configured
        • Category Codes
        • Validating
        • Hold Codes
        • Disp Options (display options)
        • Versions
        • Process Mfg (process manufacturing)
        • Interop (interoperability)
      • Entering Work Order Headers
        • Header Area
        • Dates and Quantities
        • Status & Type
        • Additional Details 1
    • Entering Rate Schedules
      • Understanding Rate Schedule Entry
      • Prerequisites
      • Form Used to Enter Rate Schedules
      • Setting Processing Options for the Enter/Change Rate Schedule Program (P3109)
        • Defaults
        • Display
        • Categories
        • Process
        • Edits
        • Versions
        • Interoperability
        • Hold Codes
      • Entering Rate Schedules
    • Importing Work Orders and Rate Schedules from External Systems (Release 9.2 Update)
    • Processing Work Orders and Rate Schedules
      • Understanding Work Order and Rate Schedule Processing
        • Order Processing
      • Prerequisites
      • Running the Order Processing Program
      • Setting Processing Options for the Order Processing Program (R31410)
        • Edits
        • Process
        • Defaults
        • Parts List
        • Routing
        • Sales/Configurator
        • Printing 1
        • Printing 2
        • Warehouse Management
        • Versions
        • Interoperability
    • Attaching Parts Lists
      • Understanding Attachment of Part Lists
      • Understanding Phantom Items
      • Understanding Parts List Requirements
      • Understanding How to Attach Parts Lists Interactively
      • Forms Used to Attach Parts Lists Interactively
      • Setting Processing Options for the Work Order Parts List Program (P3111)
        • Edits
        • Process
        • Warehousing
        • Versions
        • Export
      • Entering Custom Parts Lists
      • Copying Parts Lists from Bills of Material
      • Copying Parts Lists from Existing Work Orders
      • Selecting Substitute Items
      • Entering Multiple Locations
    • Attaching Routing Instructions
      • Understanding Attachment of Routing Instructions
      • Understanding Outside Operations
      • Understanding How to Attach Routing Instructions Interactively
      • Understanding Electronic and Device Quality Records
      • Prerequisites
      • Forms Used to Attach Routing Instructions Interactively
      • Setting Processing Options for the Work Order Routing Program (P3112)
        • Process
        • Export
        • Versions
      • Entering Custom Routings
      • Copying Routing Instructions from Standard Routings
      • Copying Routing Instructions from Existing Work Orders
      • Adding Purchase Orders from Outside Operations
    • Attaching Co-Products and By-Products
      • Understanding the Methods Used to Attach Co-Products and By-Products
      • Form Used to Attach Co-Products and By-Products
      • Attaching Co-Products and By-Products
    • Attaching Intermediate Items
      • Understanding Intermediate Items
      • Form Used to Attach Intermediate Items
      • Attaching Intermediate Items
    • Assigning Serial Numbers
      • Understanding Serial Number Assignment
      • Prerequisite
      • Form Used to Assign Serial Numbers
      • Assigning Serial Numbers
  • 6 Working with Commitments
    • Understanding Commitments
    • Defining Commitment Rules
      • Understanding Commitment Rules
      • Forms Used to Define Commitment Rules
      • Defining the Commitment Method for an Item
      • Defining the Commitment Control and Type of Commitment
    • Defining Commitments at a Work Center Location
      • Understanding Commitments at a Work Center Location
      • Forms Used to Define Commitments at a Work Center Location
      • Defining the Work Center in the Routing Instruction for an Item
      • Defining the Location at the Work Center
      • Assigning a Component to a Routing Operation
    • Managing Commitments for Grade and Potency
      • Understanding Commitments for Grade and Potency
        • Conversion of Units of Measure for Potent Units
        • Management of Commitments for Grade- and Potency-Controlled Items
      • Prerequisite
      • Forms Used to Manage Commitments for Grade and Potency
      • Converting Units of Measure for Potent Units
      • Managing Commitments for Grade- and Potency-Controlled Items
    • Reposting Commitments
      • Understanding the Repost Open Work Orders Program
        • Grower and Blend Management (Release 9.2 Update)
      • Prerequisites (Release 9.2 Update)
      • Running the Repost Open Work Orders Program (Release 9.2 Update)
      • Setting Processing Options for Repost Open Work Orders (R3190)
        • Process
  • 7 Working with Availability and Shortages
    • Understanding Availability and Shortages
    • Defining Availability Calculations for a Branch
      • Forms Used to Define Availability Calculations for a Branch
      • Defining Availability Calculations for a Branch
    • Reviewing Part Availability Information
      • Understanding Part Availability Information
      • Forms Used to Review Part Availability Information
      • Setting Processing Options for the Part Availability Program (P30200)
        • Defaults
        • Versions
        • Select
        • Process
      • Reviewing Part Availability
      • Setting Processing Options for the Parts List Inquiry Program (P3121)
        • Versions
      • Reviewing Parts List Availability
    • Managing Shortage Information
      • Understanding Shortage Information
      • Forms Used to Manage Shortage Information
      • Setting Processing Options for the Shortage Revisions Program (P3118)
        • Versions
        • Defaults
      • Revising Shortage Information
  • 8 Working with Issues, Material Movement, and Kanbans
    • Understanding Issues, Material Movement, and Kanbans
    • Understanding Inventory Issue
    • Issuing Material by Preflushing
      • Understanding Preflushing
      • Prerequisite
      • Running the Order Processing Program
    • Issuing Material Manually
      • Understanding the Manual Issue of Material
      • Forms Used to Issue Material Manually
      • Setting Processing Options for the Work Order Inventory Issues Program (P31113)
        • Edits
        • Display
        • Versions
        • Equipment Management
        • Interoperability
      • Issuing Material from a Single Location
      • Issuing Material from Multiple Locations
    • Recording Component Scrap
      • Understanding the Recording of Component Scrap
        • Working with Electronic and Device Quality Records
      • Forms Used to Record Component Scrap
      • Setting Processing Options for the Component Scrap Program (P31116)
        • Process
        • Defaults
        • SN Processing
        • Versions
      • Recording Component Scrap
  • 9 Using Work Order Scheduling and Rate Schedules
    • Understanding Work Order Scheduling and Rate Schedules
    • Understanding Work Order Mass Updates for Manufacturing Work Orders
      • Accessing the Work Order Mass Update Programs
      • Setting Up Your Manufacturing Environment to Use the Work Order Mass Update Process
      • Manufacturing-Specific Work Order Mass Update Functions
    • Revising Work Order Status Information
      • Form Used to Revise Work Order Status Information
      • Setting Processing Options for the Shop Floor Workbench Program (P31225)
        • Default 1
        • Default 2
        • Versions 1
        • Versions 2
        • Interoperability
      • Revising Work Order Status Information
    • Scheduling Items on a Production Line
      • Understanding the Scheduling of Items on a Production Line
      • Form Used to Schedule Items on a Production Line
      • Setting Processing Options for the Line Scheduling Workbench Program (P3153)
        • Defaults
        • Display
        • Versions
      • Scheduling Items on a Production Line
    • Sequencing Rates by Classification Scheme
      • Understanding the Sequencing of Rates by Classification Scheme
      • Form Used to Sequence Rates by Classification Scheme
      • Setting Processing Options for Line Sequencing Workbench (P3156)
        • Process
        • Defaults
      • Sequencing Rates by Classification Scheme
  • 10 Working with Hours and Quantities
    • Understanding Hours and Quantities
    • Entering Hours and Quantities
      • Understanding Hours and Quantities Entry
        • Working with Electronic and Device Quality Records
      • Forms Used to Enter Hours and Quantities
      • Setting Processing Options for the Hours and Quantities Program (P311221)
        • Display
        • Defaults
        • Edits
        • Versions
        • Interoperability
      • Entering Hours and Quantities
    • Updating Hours and Quantities
      • Understanding Hours and Quantities Update
      • Updating Hours and Quantities
      • Setting Processing Options for the Hours and Quantities Update Program (R31422)
        • Interoperability
        • S/WM
        • Defaults
    • Reviewing Statuses and Transactions
      • Understanding the Review of Statuses and Transactions
        • Reviewing Hours and Quantities Transactions
      • Forms Used to Review Hours and Quantities Transactions
      • Running the Hours and Quantities Proof Report
      • Reviewing the Status of Hours
      • Reviewing the Status of Quantities
      • Setting Processing Options for the Operation Quantity Inquiry Program (P31124)
        • Defaults
  • 11 Working with Completions
    • Understanding Completions
    • Completing Discrete Work Orders
      • Understanding Discrete Work Order Completion
        • Releasing Sales Backorders During Completions
        • Managing Completions That Use Receipts Routing
        • Processing Work Orders through Super Backflush
        • Completing Work Orders with Serialized Components
        • Working with Electronic and Device Quality Records
      • Prerequisites
      • Forms Used to Complete Discrete Work Orders
      • Setting Processing Options for the Work Order Completions Program (P31114)
        • Defaults
        • Edits
        • WO Status
        • Lot Hold Codes
        • Sales Orders
        • Process Manufacturing
        • Serial Numbers
        • Warehouse Management
        • Cross Docking
        • Versions
        • Interoperability
      • Completing Work Orders Without Backflushing
        • Quantity
        • Lot/Location
      • Completing Work Orders Through Backflush
      • Completing a Work Order for Multiple Locations
      • Releasing Sales Backorders During Completions
      • Managing Completions Using Receipts Routing
      • Setting Processing Options for the Super Backflush Program (P31123)
        • Defaults
        • Process
        • Edits
        • Versions
        • Interoperability
      • Processing Work Orders Through Super Backflush
      • Completing Work Orders with Serialized Components
    • Completing Process Work Orders
      • Understanding Process Work Order Completion
        • Setting the Resource Percent for the Co-Products and By-Products
        • Releasing Sales Backorders During Completions
        • Processing Process Orders through Super Backflush
      • Prerequisites
      • Forms Used to Complete Process Work Orders
      • Completing Process Orders Without Backflushing
      • Completing Process Orders Through Backflush
      • Setting the Resource Percent for the Co-Products and By-Products
      • Releasing Sales Backorders During Completions
      • Processing Process Orders Through Super Backflush
    • Completing Rate Schedules
      • Understanding Rate Schedule Completion
      • Prerequisite
      • Forms Used to Complete Rate Schedules
      • Setting Processing Options for the Completions Workbench Program (P3119)
        • Defaults
        • Edits
        • Versions
        • Process
      • Completing Rate Schedules
  • 12 Processing Transactions for Lean Manufacturing
    • Understanding Lean Manufacturing Transactions
    • Creating Shop Floor Daily Plans
      • Understanding Shop Floor Daily Plans
      • Form Used to Create Shop Floor Daily Plans
      • Setting Processing Options for Daily Planning (PF31010B)
        • Defaults
      • Creating a Shop Floor Daily Plan
    • Preprocessing Daily Plans
      • Understanding Daily Plan Preprocessing
      • Prerequisites
      • Setting Processing Options for BOM and Routing Detail Generation (RF31010A) and Routing Detail Generation - DFM Plan (RF31013)
        • Default
      • Running the BOM and Routing Detail Generation Program
      • Running the Routing Detail Generation - DFM Plan Program
      • Setting Processing Options for BOM and Routing Detail Generation - Item/Branch (RF31012)
        • Default
      • Running the BOM and Routing Detail Generation - Item/Branch Program
    • Performing Lean Item Completions
      • Understanding Lean Completions
        • Shop Floor Daily Plan Completions
        • Demand Flow Daily Plan Completions
        • Ad Hoc Item Completions
        • Work Order Completions
      • Prerequisites
      • Forms Used to Perform Lean Completions
      • Setting Processing Options for Item Completions (PF31011)
        • Default
      • Setting Processing Options for Multi-Level Item Completions (RF31011B)
        • Doc Type
        • Versions
      • Setting Processing Options for Shop Floor Plans (PF31012)
        • Defaults
        • Versions
      • Selecting Shop Floor Daily Plans for Completion
      • Setting Processing Options for Demand Flow Plans (PF31013)
        • Defaults
        • Process
        • Versions
      • Selecting Demand Flow Daily Plans for Completion
      • Performing Item Completions
      • Performing Ad Hoc Item Completions
      • Completing Work Orders Against Demand Flow Daily Plans
    • Managing Completion Transactions
      • Understanding Item Completion Reversals
      • Forms Used to Manage Transactions
      • Setting Processing Options for Transaction Management (PF31014)
        • Default
      • Reversing Item Completions
      • Reviewing Transaction Details
  • 13 Managing Work Order and Rate Schedule Information
    • Understanding Work Order and Rate Schedule Information
    • Deactivating Work Orders and Rate Schedules
      • Understanding Work Order and Rate Schedule Deactivation
        • Work Order and Rate Schedule Deactivation
        • Rate Schedule and Work Order Status Review
        • Work Order Closure
        • Rate Schedule Closure
        • Work Order Purge
      • Prerequisite
      • Forms Used to Deactivate Work Orders and Rate Schedules
      • Reviewing Work Order and Rate Schedule Status
      • Setting Processing Options for the Production Status Program (P31226)
        • Defaults
        • Process
      • Changing the Status of Work Orders to Closed
      • Changing the Status of Rate Schedules to Closed
      • Setting Processing Options for the Batch Rate Close Program (R3191)
        • Process
      • Purging Work Orders
      • Setting Processing Options for the Purge Orders Program (R4801P)
        • Process
        • (Release 9.2 Update) Version
      • (Release 9.2 Update) Setting Processing Options for the Purge Work Order Ledger Program (R48019P)
        • Process
        • Reviewing Work Order and Rate Schedule Information
    • Reviewing Work Order and Rate Schedule Information
      • Understanding Work Order and Rate Schedule Review
        • What You Can Review
        • Part Usability
        • Summary Availability
        • Item Ledger Information
        • Dispatch List Information
        • Production History
        • Production Line Quantities
        • Production Across Lines
        • Work Center Loads
        • Process Orders
      • Prerequisite
      • Forms Used to Review Work Orders and Rate Schedules
      • Setting Processing Options for the Part Usability Program (P30212)
        • Default
        • Versions
      • Reviewing Summary Availability
      • Setting Processing Options for the Summary Availability Program (P41202)
        • Versions
        • Display
        • Lot Options
      • Reviewing Item Ledger Information
      • Reviewing Dispatch List Information
      • Setting Processing Options for the Dispatch List Program (P31220)
        • Defaults
        • Versions
        • Process
      • Reviewing Production History
      • Setting Processing Options for the Production History Program (P31227)
        • Defaults
      • Reviewing Production Line Quantities
      • Setting Processing Options for the Line Dispatch List Program (P3159)
        • Defaults
        • Process
      • Reviewing Production Across Lines
      • Setting Processing Options for the Line Schedule Review Program (P3152)
        • Defaults
        • Versions
      • Reviewing Work Center Loads
      • Setting Processing Options for the Work Center Schedule Review Program (P31224)
        • Defaults
        • Display Options
        • WO Processing
        • Versions
      • Reviewing Process Orders
    • Working with Work Center Load Review Calendar
      • Understanding the Work Center Load Review Calendar
        • Using the Work Center Load Review Calendar
        • Access to Additional Programs from the Work Center Load Review Calendar
      • Prerequisite
      • Reviewing the Work Center Load
      • Setting Processing Options for the Work Center Load Review Calendar Program (P313004X)
        • Defaults
        • Process
        • Versions
    • Using the Scheduled Work Order Operations Chart (Release 9.2 Update)
      • Accessing Additional Programs
      • Viewing Scheduled Work Order Operations
      • Rescheduling Work Order Operations
      • Using the Scheduled Work Order Operations Chart in a CafeOne Layout
    • Working with Supply and Demand Information
      • Understanding Supply and Demand Information
      • Form Used to Review Supply and Demand Information
      • Reviewing Supply and Demand Information
      • Setting Processing Options for the Supply/Demand Inquiry Program (P4021)
        • Process
        • Display
        • Versions
    • Working with Bills of Material
      • Understanding Bills of Materials
      • Forms Used to Work with Bills of Material
      • Comparing Two Parts Lists
      • Comparing a Bill of Material to a Parts List
  • 14 Appendix A - JD Edwards EnterpriseOne Shop Floor Management Reports
    • JD Edwards EnterpriseOne Shop Floor Management Reports: A to Z
    • JD Edwards EnterpriseOne Selected Shop Floor Management Reports
      • Processing Options for Shortage Revisions Print (R3118P)
        • Print
      • R31418 - W. O. Component Shortage List
      • Processing Options for Component Shortages (R31418)
        • Edits
        • Print
      • R4051 - Supply and Demand
      • Processing Options for Supply and Demand (R4051)
        • Process
        • Display
      • RF31011P - Lean Transactions - Purge
  • 15 Appendix B - Delivered User Defined Objects for Shop Floor Management (Release 9.2 Update)
    • Shop Floor Management Notifications
    • Shop Floor Management Orchestrations
  • 16 Appendix C - Managing Work Order and Rate Schedule Information Using ADF
    • Understanding Work Order and Rate Schedule Information Using ADF
    • Deactivating Work Orders and Rate Schedules
      • Understanding Work Order and Rate Schedule Deactivation
        • Work Order and Rate Schedule Deactivation
        • Rate Schedule and Work Order Status Review
        • Work Order Closure
        • Rate Schedule Closure
        • Work Order Purge
      • Prerequisite
      • Forms Used to Deactivate Work Orders and Rate Schedules
      • Reviewing Work Order and Rate Schedule Status
      • Setting Processing Options for the Production Status Program (P31226)
        • Defaults
        • Process
      • Changing the Status of Work Orders to Closed
      • Changing the Status of Rate Schedules to Closed
      • Setting Processing Options for the Batch Rate Close Program (R3191)
        • Process
      • Purging Work Orders
      • Setting Processing Options for the Purge Orders Program (R4801P)
        • Process
        • (Release 9.2 Update) Version
      • (Release 9.2 Update) Setting Processing Options for the Purge Work Order Ledger Program (R48019P)
        • Process
    • Reviewing Work Order and Rate Schedule Information
      • Understanding Work Order and Rate Schedule Review
        • What You Can Review
        • Part Usability
        • Summary Availability
        • Item Ledger Information
        • Dispatch List Information
        • Production History
        • Production Line Quantities
        • Production Across Lines
        • Work Center Loads
        • Process Orders
      • Prerequisite
      • Forms Used to Review Work Orders and Rate Schedules
      • Setting Processing Options for the Part Usability Program (P30212)
        • Default
        • Versions
      • Reviewing Summary Availability
      • Setting Processing Options for the Summary Availability Program (P41202)
        • Versions
        • Display
        • Lot Options
      • Reviewing Item Ledger Information
      • Reviewing Dispatch List Information
      • Setting Processing Options for the Dispatch List Program (P31220)
        • Defaults
        • Versions
        • Process
      • Reviewing Production History
      • Setting Processing Options for the Production History Program (P31227)
        • Defaults
      • Reviewing Production Line Quantities
      • Setting Processing Options for the Line Dispatch List Program (P3159)
        • Defaults
        • Process
      • Reviewing Production Across Lines
      • Setting Processing Options for the Line Schedule Review Program (P3152)
        • Defaults
        • Versions
      • Reviewing Work Center Loads
      • Setting Processing Options for the Work Center Schedule Review Program (P31224)
        • Defaults
        • Disp Options
        • WO Processing
        • Versions
      • Reviewing Process Orders
    • Working with Work Center Load Review Calendar
      • Understanding the Work Center Load Review Calendar
        • Using the Work Center Load Review Calendar
        • Access to Additional Programs from the Work Center Load Review Calendar
      • Prerequisite
      • Reviewing the Work Center Load
      • Setting Processing Options for the Work Center Load Review Calendar Program (E313000)
        • Defaults
        • Process
        • Versions
    • Using the Scheduled Work Order Operations Chart (Release 9.2 Update)
      • Accessing Additional Programs
      • Viewing Scheduled Work Order Operations
      • Rescheduling Work Order Operations
      • Using the Scheduled Work Order Operations Chart in a CafeOne Layout
    • Working with Supply and Demand Information
      • Understanding Supply and Demand Information
      • Form Used to Review Supply and Demand Information
      • Reviewing Supply and Demand Information
      • Setting Processing Options for the Supply/Demand Inquiry Program (P4021)
        • Process
        • Display
        • Versions
    • Working with Bills of Material
      • Understanding Bills of Materials
      • Forms Used to Work with Bills of Material
      • Comparing Two Parts Lists
      • Comparing a Bill of Material to a Parts List
  • 17 Appendix D - Enterprise Automation for Manufacturing: Production Order to Cost Update (Release 9.2 Update)
    • Understanding Enterprise Automation
    • Prerequisites
    • Key Concepts
    • Understanding the EA Production Orders EnterpriseOne Page
    • Using the EA Production Orders EnterpriseOne Page
    • Watchlists in the EA Production Orders EnterpriseOne Page
    • Setting Processing Options for Production Order to Cost Update (P31003X)
      • Default
    • KPIs for Production Order to Cost Update Process
  • 18 Glossary
    • Bill Type
    • Branch/Plant
    • Document Type
    • Due Date
    • Employee Number
    • Freeze Code
    • Item Number
    • Line/Cell
    • Line Type
    • Order Number
    • Quantity Completed
    • Quantity Scrapped
    • Request Date
    • Routing Type
    • Shift Code
    • Status
    • Unit of Measure
    • Variance