Oracle EDR InfiniBand Switch and Virtualized I/O Systems Administration Guide

Exit Print View

Updated: November 2016
 
 

Monitoring Switch Components and Identification (Oracle ILOM CLI)

You can do most switch monitoring tasks any time after the switch is online. However, some basic switch tasks should be done before others each time the switch is powered on or restarted. This table shows the general order for these tasks.

Step
Task
Links
1.
Check for any faults.
2.
Check the System LED.
3.
Check the date and time parameters.
4.
Check the switch identification information.
5.
Check the state of ASR.
6.
For virtualization switches, check modules.

Related Information