Go to main content

SPARC M8 and SPARC M7 Servers Service Manual

Exit Print View

Updated: January 2022
 
 

Install the Battery

  1. Insert the new battery with the positive side facing out.
    image:Illustration that shows the battery orientation for                             installation.
  2. Install the SP back into the server.

    See Install an SP or SPP.

    If the SP is configured to synchronize with a network time server using the Network Time Protocol, the Oracle ILOM clock will be reset as soon as the server is powered on and connected to the network.

  3. Verify that the fault has been cleared and the replaced component is operational.

    See Verify That a Fault Has Been Cleared.

Related Information