Facility Power
Checklist
Complete the following checklist to ensure that the facility
power requirements are met for the data center in which the server
will be installed.
Table 15 Facility Power Checklist
|
|
|
|
|
Do you know the required operating voltage and electric current level of the device and
peripherals? |
|
|
|
|
Are enough
power outlets provided within 2 meters (6.5 feet) for each rack? |
|
|
|
|
Do the power
outlets have appropriate socket receptacles? |
|
|
|
|
Will optional
ground cables be attached to the rack? |
|
|
|
|
Are the circuit
breakers for the equipment suitable in terms of voltage and current-carrying
capacities? |
|
|
|
|
Does the power
frequency meet the equipment specifications? |
|
|
|
|
Will system
power be delivered from two separate grids? |
|
|
|
|
Is there a UPS to power
the equipment? |
|
|
|
|
|