Go to main content
Oracle® Server X5-4 Service Manual

Exit Print View

Updated: December 2015
 
 

Install a Power Supply

This procedure describes how to install a power supply (PSU). When installing a PSU, ensure that the pawl near the hinge of the latch engages the slot in the sidewall of the PSU bay. The pawl supplies the necessary leverage to seat the PSU connector with the PSU backplane.


Caution

Caution  -  System overheat and shut down. Installing the incorrect model of power supply can cause the server to over heat. Install only the supported model.


Before You Begin

  1. Ensure that the replacement power supply handle is in the open position.
  2. Align the power supply with the empty power supply bay.
  3. Slide the power supply into the bay until it stops.
  4. To seat the power supply, rotate the release handle upward until it locks in place.

    Note -  The pawl at the hinge of the handle must engage the slot at the bottom of the power supply bay.

    This action of rotating the handle upward draws the power supply into the server and engages it with the internal connector.


    image:A multistep illustration showing how to install a power supply in the server.
  5. Connect the AC power cord to the power supply.
  6. Reattach the power cord retaining clip.
  7. Verify that the AC Present indicator is lit.

    For more information, see Power Supply Reference.

  8. If you performed a cold-service procedure, power on the server.
  9. Verify that the following indicators are not lit: