Go to main content
Netra SPARC S7-2 Server Service Manual

Exit Print View

Updated: February 2017
 
 

Returning a Server to Operation

These topics explain how to return a Netra SPARC S7-2 server from Oracle to operation after you perform service procedures.

Step
Task
Link
1.
Install the air duct if you serviced these components:
  • PSU duct

  • DIMMs

  • LED board

2.
Install the PSU duct if you serviced these components:
  • Air duct

  • USB board

  • Motherboard

  • PDB

  • PDB signal cable

3.
Secure the drive cage if you serviced the components in Step 1, Step 2, or the drive backplane.
4.
Install the fan tray if you serviced the components in Step 1, Step 2, Step 3, or these components:
  • Drive signal cable

  • Drive power cable

5.
Install the top cover if you serviced the components in Step 1, Step 2, Step 3, Step 4 or these components:
  • Fan modules

  • PCIe cards

  • Battery

6.
Install the server into the rack.
See Netra SPARC S7-2 Server Installation Guide to install the server into the rack.
7.
Connect power cords to the server.
8.
Power on the server by one of two methods.
9.
Verify the installation of the component, if you serviced the components in Step 1, Step 2, Step 3, Step 5, or these components.
  • Drives

  • Power supplies

Related Information