Install the PCI Mezzanine

  1. Position the PCI mezzanine onto the chassis.
  2. Lower the PCI mezzanine and slide it toward the front of server, ensuring that it is fully seated on the PCI risers.
    image:Figure showing how to install and secure the PCI mezzanine in the system.
  3. Using a No. 2 Phillips screwdriver, tighten the four PCI mezzanine screws.
  4. Reconnect the following PCI mezzanine cables.
    • LED board cable

    • Fan tray 1 power cable

    • Power cable from PDB

    • Internal SAS HBA cable

    • Fan tray 2 power cable

    Figure 11  Reconnecting PCI Mezzanine Cables

    image:showing PCI mezzanine cable being installed.

    Figure Legend

    1 Power cable from the PDB

    2Internal SAS HBA cable

    3Fan tray 1 power cable

    4Fan tray 2 power cable

    5Front indicator board cable



  5. If you removed any internal cables from installed PCIe2 cards prior to removing the PCI mezzanine, reconnect these cables to the cards.
  6. Return the server to operation.

    See Returning Server to Operation.